Slope Stabilization
Enhances shear strength by 40-60% through 3D soil confinement
Reduces erosion rates by ≥90% on steep (>45°) slopes
Vegetation Support
Cell structure retains 20-30L/m² moisture for plant establishment
Enables root penetration depth up to 1.5m in rocky substrates
Material Specifications
UV-resistant HDPE (≥80% strength retention after 10 years)
Typical cell size: 400×400×150mm
Tensile strength: ≥25kN/m (ASTM D6637)
Slope Preparation
Scaling of loose rocks (>50mm)
Benching for slopes >1:1 (V:H)
Drainage Systems
Install composite drains @ 15m vertical spacing
Anchoring System
Soil nails: Φ25mm @ 2m grid
Grouted tendon length: ≥4m
Infilling Material
Growth medium: 50% weathered rock + 30% compost + 20% bentonite
Planting Scheme
Pioneer species: Legumes + grasses (80g/m²)
Shrubs: 3-5 plants/m²
▸ Revegetation Rate: 70% coverage in 12 months
▸ Structural Stability: Withstands 200-year rainfall events
▸ ROI Period: 3-5 years vs. conventional riprap
Title: "Geocell Applications in Mine Slope Rehabilitation: Integrated Engineering and Ecological Approaches"
Innovative Aspects:
✔ Acid Mine Drainage Control: pH stabilization to 6.5-8.0
✔ Heavy Metal Sequestration: 60-80% reduction in leaching
✔ Modular Design: Accommodates up to 500mm differential settlement
Standards Compliance:
ISO 13426: Geocell connection strength
Global Mining Standards Group GMSG-12
SMCRA (Surface Mining Control Regulations)
Case Study Data:
Coal Mine (Wyoming, USA): 92% vegetation survival after 3 years
Copper Mine (Chile): 50% cost reduction vs. shotcrete solutions
COMPANY:TAI'AN CITY RUIHENG BUILDING MATERIALS CO., LTD
Contact:Nickle Nie
Tel:008615866038408
Phone:008615866038408
Email:nickle@rhgeos.com
Add:NO.3566 LONGQUAN ROAD,TAI'AN HI-TECH ZONE,SHANDONG PROVINCE,CHINA