High Drainage Capacity – Rapidly removes water from the subgrade, reducing pore water pressure and preventing weakening of the road structure.
Soil Separation & Stabilization – Prevents fine soil particles from clogging the drainage system while reinforcing weak subgrades.
Reduces Frost Heave & Pavement Damage – Minimizes water retention, lowering the risk of freeze-thaw damage in cold climates.
Cost & Time Efficiency – Faster installation compared to traditional drainage systems, reducing labor and material costs.
Long-Term Durability – Resists chemical degradation and maintains performance over decades.
Excavate and level the subgrade to design specifications.
Remove debris, sharp objects, and unstable soil to prevent damage to the drainage net.
Compact weak or loose subsoil to improve load-bearing capacity.
Apply a geotextile separator (if required) to prevent fine soil migration into the drainage layer.
Roll out the drainage net horizontally over the prepared subgrade.
Ensure proper overlap (typically 30–50 cm) and secure edges with stakes or adhesive to prevent shifting.
Connect the net to outlet pipes or edge drains for proper water discharge.
Cover the drainage net with a permeable granular fill (e.g., gravel or crushed stone).
Compact the fill layer in thin lifts to avoid damaging the geocomposite.
Proceed with standard road base, asphalt, or concrete layers as per design.
Applications in Highways
Subsurface Drainage – Prevents waterlogging under pavements.
Retaining Walls & Embankments – Reduces hydrostatic pressure behind structures.
Tunnel & Bridge Approaches – Controls groundwater seepage.
Landfill & Railway Projects – Used for similar drainage purposes.
Inspect outlet pipes periodically to ensure no clogging.
Check for soil settlement or damage after heavy rainfall.
By using composite drainage nets, highway projects achieve better longevity, reduced maintenance, and improved performance in wet conditions.
COMPANY:TAI'AN CITY RUIHENG BUILDING MATERIALS CO., LTD
Contact:Nickle Nie
Tel:008615866038408
Phone:008615866038408
Email:nickle@rhgeos.com
Add:NO.3566 LONGQUAN ROAD,TAI'AN HI-TECH ZONE,SHANDONG PROVINCE,CHINA