Construction of Drainage Boards in Underground Garages

1. Introduction

Drainage boards (also known as drainage mats or composite drainage systems) play a 

critical role in underground garage construction by:

  • Preventing water accumulation behind retaining walls

  • Reducing hydrostatic pressure on waterproofing membranes

  • Providing a clear drainage path to sump pumps

2. Material Selection

High-performance drainage boards should meet:

  • Compressive strength: ≥500 kPa (EN 12430)

  • Flow capacity: ≥0.5 l/m·s (ASTM D4716)

  • Chemical resistance: pH 2-12 compatibility

  • Geotextile filter layer: 110-150 g/m² nonwoven (to prevent clogging)

3. Installation Procedure

3.1 Substrate Preparation

  • Verify structural slab is properly sloped (1-2% gradient)

  • Remove sharp protrusions (>3mm) that could damage membranes

  • Clean surface of debris and standing water

3.2 Board Installation

  1. First layer: Install waterproofing membrane (tested to 0.5MPa water pressure)

  2. Drainage board orientation:

    • Dimpled side against waterproofing

    • Flow channels aligned with fall direction

  3. Seaming:

    • Overlap minimum 100mm at edges

    • Mechanically fastened every 300mm

  4. Perimeter details:

    • Connect to perimeter drain pipes via sock-wrapped connectors

    • Seal penetrations with bentonite tape

3.3 Protection Layer

  • Install 400g/m² geotextile separation layer

  • Pour structural slab (minimum C25/30 concrete)

4. Quality Control

CheckpointMethodAcceptance Criteria
Board integrityVisualNo crushing/damage
Slope verificationLaser level≥1% gradient
Flow connectionWater testNo ponding after 15min
Seam strengthPeel test≥50 N/50mm

5. Benefits of Proper Installation

✔ 30-year design life when combined with quality waterproofing
✔ 60% faster water removal vs. granular drainage layers
✔ Space savings: 50mm board replaces 300mm gravel layer

6. Common Mistakes to Avoid

✖ Installing boards upside-down (dimples must face membrane)
✖ Inadequate slope toward drainage points
✖ Failure to protect boards during rebar placement

Technical Support Available
Our engineering team provides:
→ Site-specific drainage calculations
→ CAD details for critical junctions
→ Third-party inspection services

"Dry garages start with proper drainage"


Keywords: Garage drainage system, Hydrostatic pressure relief, Dimpled membrane, 

Below-grade waterproofing

(This specification aligns with EN 13948 and ACI 302.1R-15 standards)

Would you like to include:

  1. Material comparison table (HDPE vs. PP boards)

  2. Construction sequence animations

  3. Cost analysis vs. traditional methods?

上一条:Construction of Geomembrane for Tailings Treatment 下一条:没有了!

CONTACT US

COMPANY:TAI'AN CITY RUIHENG BUILDING MATERIALS CO., LTD

Contact:Nickle Nie

Tel:008615866038408

Phone:008615866038408

Email:nickle@rhgeos.com

Add:NO.3566 LONGQUAN ROAD,TAI'AN HI-TECH ZONE,SHANDONG PROVINCE,CHINA