The [Project Name] at [Location] involves construction in [Specific Area]. Due to complex geological conditions, high groundwater levels, and soil stability concerns, PP (polypropylene) geotextiles will be deployed for reinforcement, drainage, and separation to ensure long-term structural integrity.
Material: PP geotextile compliant with national standards.
Key Parameters:
Mass per unit area: [X] g/m²
Tensile strength: ≥[X] kN/m (longitudinal), ≥[X] kN/m (transverse)
Tear resistance: ≥[X] N (both directions)
CBR puncture strength: ≥[X] kN
Permeability coefficient: [X]×10⁻¹ to [X]×10⁻³ cm/s
Verify certifications (quality reports, factory test data). Conduct batch sampling.
Store in ventilated, dry areas; avoid UV exposure, chemicals, and open flames.
Clear vegetation, debris, and loose soil. Achieve surface flatness (±[X] cm).
Fill depressions with compatible material; grind sharp rock protrusions.
Mark boundaries using total stations (control points ≤[X] m apart).
Align geotextile with flow direction (flat areas) or top-to-bottom (slopes).
Unrolling: Lay without tension; maintain ≥[X] cm overlaps.
Seaming:
Sewn joints: Industrial sewing machines (stitch spacing: [X] mm; thread strength ≥ geotextile).
Bonded joints: Apply adhesive evenly (width ≥ overlap); roll to eliminate air pockets.
Slope crest: Bury in [X] cm × [X] cm trench; backfill compacted soil.
Slope face: Secure with U-pins (spacing: [X] m; length ≥[X] cm).
Flat areas: Cover with [X] cm sand layer or weighted mats.
Inspect for wrinkles (≤50 mm), gaps, or loose seams.
Patch damages with [X] cm oversized patches (sewn/bonded).
Test samples (strength, permeability) per [X] m².
Phase | Duration (Days) | Tasks |
---|---|---|
Subgrade Prep | [X] | Clearing, leveling |
Survey | [X] | Boundary marking |
Installation | [X] | Laying, seaming |
Anchoring | [X] | Trenching, pinning |
QC | [X] | Inspections, repairs |
Note: Adjust for weather delays; suspend work during heavy rain/storms.
QMS: Project manager-led team; process controls from procurement to handover.
Process Checks: Validate each step before proceeding (e.g., seam strength).
Material QC: Reject non-compliant batches; prevent storage degradation.
Training: Regular upskilling on installation standards and defect mitigation.
HSE Team: Dedicated safety officers; daily toolbox talks.
PPE: Mandatory helmets, harnesses, and non-slip footwear.
Equipment: Certified operators; pre-use inspections.
Emergency Prep: Fire/collapse drills; onsite first-aid kits.
Key Technical Standards
Overlap width: ≥300 mm
Slope pin spacing: ≤1.5 m
Patch overlap: ≥150 mm beyond damage
PP Geotextile Deployment for Infrastructure Resilience: Engineering Excellence in Soil Stabilization and Hydraulic Management.
Note: Replace [X] with project-specific values. Adapt anchoring/seaming methods for site conditions.
COMPANY:TAI'AN CITY RUIHENG BUILDING MATERIALS CO., LTD
Contact:Nickle Nie
Tel:008615866038408
Phone:008615866038408
Email:nickle@rhgeos.com
Add:NO.3566 LONGQUAN ROAD,TAI'AN HI-TECH ZONE,SHANDONG PROVINCE,CHINA